System Architecture Overview
The Chiller Plant Control (CPC) Redundancy configuration ensures uninterrupted plant operation by pairing two Tracerยฎ SC+ controllers (SC+1 and SC+2) in a Leader-Follower (Teamwork) architecture over a dedicated link.
Step-by-Step Interactive Workflow Tables
Phase 1: Licensing & CPC Setup (SC+1)
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
01 |
|
|
| Install CPC and Mission Critical Licenses on SC+1 | |
02 |
|
|
| Reboot SC+1 | ๐ข Mission Critical License active on SC+1 |
03 |
|
|
| Install chillers and verify communication | |
04 |
|
|
| Create CPC Plant (Applications) | |
05 |
|
|
| Configure and save CPC configuration | |
06 |
|
|
| Store CPC configuration | โญ CPC fully configured on SC+1 |
Phase 2: Enabling Redundancy (SC+1)
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
07 |
|
|
| Open CPC โ Config โ Setup | |
08 |
|
|
| Validate MC + Teamwork licenses | |
09 |
|
|
| Validate CPC instance count | |
10 |
|
|
| Check "not in teamwork" condition | |
11 |
|
|
| Show redundancy option in UI | |
12 |
|
|
| Request "Enable Redundant CPC" | |
13 |
|
|
| Create TCF file | โญ Redundancy enabled on SC+1 |
Phase 3: Configure MSTP Link for Teamwork (SC+1)
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
14 |
|
|
| Open BACnet MSTP settings | |
15 |
|
|
| Validate Teamwork license | |
16 |
|
|
| Select "Teamwork" link | |
17 |
|
|
| Click OK | |
18 |
|
|
| Save MSTP settings | |
19 |
|
|
| Reboot SC+1 | โญ Teamwork link Configured |
Phase 4: Backup (SC+1) and Pause CPC
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
20 |
|
|
| Create system backup on SC+1 | |
21 |
|
|
| Copy the backup to the Tech Laptop | ๐ป Backup created |
22 |
|
|
| Pause CPC on SC+1 | โธ๏ธ CPC paused on SC+1 |
Phase 5: License SC+2
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
23 |
|
|
| Install CPC and MC Licenses on SC+2 | |
24 |
|
|
| Reboot SC+2 | ๐ข MC License Installed on SC+2 |
Phase 6: Restore & Setup on SC+2
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
25 |
|
|
| Disconnect ethernet cable to SC+2 | |
26 |
|
|
| Restore backup to SC+2 | |
27 |
|
|
| Reboot SC+2 | ๐ Backup restored |
Phase 7: Reset Network Information & Delete Non-Chiller Plant Equipment on SC+2
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
28 |
|
|
| Delete any controllers that are not part of the redundant CPC plant | |
29 |
|
|
| Update IP address, BACnet/IP, BACnet MS/TP settings, host name, and device name | |
30 |
|
|
| Reconnect ethernet cable to SC+2 | |
31 |
|
|
| Refresh equipment and verify communication | |
32 |
|
|
| Verify mapping of Supply Water Temp, Return Water Temp, and Flow Meter |
Phase 8: Sync CPC Operation
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
33 |
|
|
| Verify CPC operation on SC+2 | |
34 |
|
|
| Pause CPC on SC+2 | โธ๏ธ CPC paused on SC+2 |
35 |
|
|
| Resume CPC on SC+1 | ๐ Leader CPC active |
Phase 9: Configure Teamwork & Create a Team
Step | Actor Badge | SC+1 CPC Status | SC+2 CPC Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
36 |
|
|
| Open Teamwork UI on SC+1 | |
37 |
|
|
| Create Team | ๐ Team Created with SC+1 as a Leader |
38 |
|
|
| Add SC+2 as member | |
39 |
|
|
| Assign Leader role to SC+1 | |
40 |
|
|
| Assign Follower role to SC+2 | ๐ค Team operating |
Phase 10: Verify Redundant Operation
Step | Actor Badge | SC+1 CPC Status | SC+2 Status | Action Description | Outcome & Notes |
|---|---|---|---|---|---|
41 |
|
|
| Resume CPC on SC+2 | โญ Redundancy fully operational |
42 |
|
|
| Verify Leader CPC UI on SC+1 | |
43 |
|
|
| Verify Follower UI (disabled fields) | |
44 |
|
|
| Confirm plant control consistent across SCs | โญ Plant control consistent across SCs |
Key Controller States Reference
Throughout the setup flow, each Tracerยฎ SC+ controller transitions through distinct operational states:
Controller State | Status Badge | Operational Description |
|---|---|---|
Not Configured | โช SC+XX CPC Not Configured | Factory default state prior to license/application setup. |
Active (Leader) | ๐ข SC+1 CPC Active / ๐ Leader | Primary controlling unit executing CPC logic and commanding chillers. |
Paused | โธ๏ธ SC+XX CPC Paused | Application execution suspended during setup, backup, or role transition. |
Standby (Follower) | ๐ก๏ธ SC+2 CPC Stand By / Follower | Secondary unit monitoring Leader state; ready to take over seamlessly upon failover. |
Key Highlights & Verification Rules
- Equipment Filtering on SC+2 (Step 28): Delete all non-Chiller Plant Equipment on SC+2 so that only chillers and plant controllers remain.
- Network & Identity Reset (Step 29): Update IP address, BACnet/IP settings, BACnet MS/TP network settings, host name, and device name before reconnecting ethernet.
- Sensor Mapping Verification (Step 32): Explicitly verify the mapping of Supply Water Temperature, Return Water Temperature, and Flow Meter on SC+2 before syncing operation.
- Teamwork Role Assignment (Steps 39โ40): TW App confirms Leader role to SC+1 and Follower role to SC+2.