Issue:
Can the Tracker stage equipment to come on at delayed intervals (staggered start)
Resolution:
No, within a schedule it brings on all units at once. There are up to 10 schedules in Tracker. Separate schedules can be set up with start times that are slightly different.
Notes:
Â
Changes:
Â
Other Question/Problem/Cause Statements:
- can the TRACKER stage the units to come on in delayed intervals
- Can Tracker do staggered start
Facts:
- TRACKER BMTK
- Tracker BMTK
Original wave: wave17721
Document Identifier: DOC-84103
Document Identifier: 84103