Notice:
Equipment with 3.91 lb or 62.56 oz and greater per circuit charge of refrigerant R-454B will come factory equipped with refrigerant mitigation. R-454B is classified as an A2L refrigerant, indicating it has low flammability. This requires certain safety considerations during handling, installation, and operation. Review your equipment IOM, A2L Work Procedures, prior to starting work. There is risk of fire with flammable refrigerants! Failure to follow instructions below could result in death or serious injury, and equipment damage.
Depending on the unit configuration, there are up to two refrigerant detectors installed and initiate unit level mitigation actions if a leak is detected per ASHRAE Standard 15. See A2L Equipment and System Level Mitigation Actions for a complete sequence.
The purpose of this article is to discuss troubleshooting steps once it has been determined there are no refrigerant leaks present in the system, yet the control has an active alarm for refrigerant mitigation indicating a possible hardware or wire fault.
| The refrigeration detector installed may look similar to the images shown and will be internally mounted in the unit air path. |
|
|
The unit controls check for a contact closure when the device is powered up and when a leak is not detected. Upon detection of a leak, the contacts will open. Once the leak detection device has reset, the contacts remain open for a minimum of 5 minutes. | |
| Check to see if the refrigerant detector has an LED flash indicating its current status. |
LED Output Solid Green - Initial power up Pulsing Green - Normal Operation Red - Alarm, refrigerant detected |
|
If the LED isn't lit, confirm the detector is getting 24-27vac at sensor plug positions 1 & 2. Power isn't present or outside of the range, check wiring and transformer tapping. |
|
|
Two sensors may be wired as shown in the example. See your unit diagram for specific wiring details and wire callouts. The dry contacts on the plug wire back to a LLID at J2. |
|
|
You can test for a contact closure one of two ways using a multi-meter. - Test for VDC on the input of the LLID by measuring from J1 or J11, pin 2 (vdc -) to J2 - 1 and 2. J2 is the input on the LLID. J2 - 1 should read 3.25VDC whenever the board is powered. J2 - 2 should read 3.25VDC if the contacts are closed. - If you don't read 3.25VDC on J2-1, test to J1 or J11 (whichever one is plugged in from the Symbio control) across pins 1 & 2. You should read 24vdc. If you're not seeing 24vdc, check the IMC output connection and power at the control. - If you do read 24vdc but not at J2, remove the J2 plug from the board and test the pin 1 directly for VDC. If you have voltage with the plug disconnected, inspect the wiring going to the detector for shorts. If no voltage is measured with J2 removed, it's possible you have a defective LLID. - With J2 plug removed from the LLID, test continuity on the wires going to the detector(s). Your meter should read continuity if the path is closed/normal. Test the wires for continuity to ground and physically inspect the wires as needed. |
|
| If the contacts are closed at the LLID and you're reading the expected VDC, you may have a LLID binding issue causing the alarm. | How to you replace a binary input LLID and bind the board with Tracer TU. |
WARNING
Information in this article is intended for use by individuals possessing adequate backgrounds of electrical and mechanical experience and who comply with all federal, state, and local laws, rules, orders, or regulations related to the installation, service, or repair of a heating or central air conditioning product. Any attempt to install, service, or repair a heating or central air conditioning product may result in personal injury and/or property damage. The manufacturer or seller cannot be responsible for the interpretation of the information contained herein, nor can it assume any liability in connection with its use.